Project Summary
The schedule for this project was 3 months through the duration of the holiday seasons, beginning in early October of 2021 with completion in early January 2022. The project was awarded to us in mid-July in order for us to procure structural steel early.
The pre-existing facade of the main entry was completely demolished. A new concrete foundation was placed with new steel columns for the new facade. The entry slab was thickenened to 8″. Facade contains new integrally-colored decorative split-faced concrete masonry units, aluminum siding, prefinished corrugated metal panels, and aluminum storefront framing systems.
Inside, the store received new column wraps throughout, new decor, new vinyl flooring and wall tile at the seafood, meat, deli, bakery, and pharmacy areas. Concrete slabs were removed to demo existing refrigeration pits and related MEP scopes as required for relocation of refrigeration units.